The main technicians of our company have the necessary experience and ability to assemble, disassemble and operate the elevators.
The maintenance, revision and repair works of the electric and hydraulic elevators of persons and goods or ofgoods with internal control are carried out in compliance with the provisions of the technical prescription and other normative acts, according to the ISCIR authorization that our company holds.
Modernization works can be partial or total. The type of modernization is performed according to customer requirements. We provide innovation, sustainability, modern design and flexibility of our equipments.
Hyundai Elevator develops products appropriate for building designs and elevator uses so as to provide customized solutions. Not only safety and ride quality but space efficiency is taken into account to provide you with optimal products that will raise the value of buildings with exquisite designs and convenient functions.
Alimak industrial elevators provide a durable and reliable vertical access solution for industrial facilities. Industrial elevators efficiently transport passengers and materials to critical elevated areas on industrial sites eliminating the need for stair climbing, enhancing safety and productivity.
The City Business Center office complex from Timișoara imposes a European decor on top corporations, becoming the business heart of the community. Within the complex were installed 4 elevators with a capacity of 1000 kg, speed 1m/s and 9 stations.
"Titu Maiorescu" University is a private higher education institution in Bucharest, being established on September 20, 1990. Our company installed an elevator with a capacity of 1000 kg, with 5 stations and a speed of 1m/s.
The Dedeman chain of stores has been on the market since 1992, being intended for those who want to arrange their homes. With an area of over 5000 square meters, the store is intended for those who want to purchase sanitary ware, electrical, construction materials, interior design materials, garden items, etc. Within this project were installed 3 elevators with the capacity of 1800 kg, with 2 stations and speed 0.5m/s.
Hermes Business Campus is an office complex managed by the real estate consulting company Colliers International. The complex is located on Dimitrie Pompei Boulevard, with a built area of 78,000 square meters and an underground car park.
Within this complex were installed 4 elevators in 2016 with the following technical characteristics:
SC ETI EUROPEAN FOOD INDUSTRIES SA is a biscuit factory located in the Craiova Industrial Park, spread over 8 hectares. Our company installed lifts of 5 tons, with 3 stations, with a speed of 0.5m/s.
Maritimo is a shopping centerin Constanța, owned by the Austrian group Immofinanz, opened in autumn 2011 with an area of 50,000 square meters in which our company assembled 3 elevators, capacity 1000 kg, with 2 stations, speed 0.5m/s.
Mega Image is one of the first and largest supermarket chains in Romania, founded in 1995. Inside this supermarket we mounted an elevator with a capacity of 2500kg, with 2 stations, with a speed of 1m/s
Built in the years 1960-1970, the Târgu Jiustadium has a capacity of 12,500 seats. The stadium can be used for organizing both national and international sports competitions. Within this project was installed an elevator with a capacity of 630 kg, with 4 stations, speed 1.0 m/s.
Located near the Nordhavnen district, The Silo is one of the industrial buildings transformed at the end of 2016 into a private apartment complex and complex for public institutions. Within this project were installed elevators of 1150 kg, 14 stations / 25 doors, speed 2.00 m/s, but also elevators of 13 stations / 24 doors, speed 2.00 m/s.
Located in the heart of the city, the new residential tower is part of the UCC University College complex. Positioned in the southeast and with an area of 10,000 m2, the residential complex is built as part of the campus of UCC University College. The entire campus combines educational and commercial centers to give a vibrant and multifunctional note to the urban area. Elevators have been installed in this project.
Located near Copenhagen, in the Herlev region, which also bears the name, the university hospital is the seventh tallest hospital in the world, being the tallest building in Denmark. Its construction began in 1965 and was completed in 1975. Within the Herlev Hospital project, 16 elevators were installed. The experience gained over the years allows our assemblers to meet daily challenges and adapt to the work environment.
Located in the northern region, Alborg Hospital is the largest medical center in Denmark and plays a key role in the sustainability of the Danish medical system. Within the Aalborg Hospital project were installed 8 elevators with the capacity of 2000 kg, with 12 stations, with a speed of 2.00 m/s, both assembly and disassembly.
The Blox complex offers new perspectives for creating important events and unique facilities in order tocarry out educational programs for students and children related to educational environments. Within this project were installed elevators with a capacity of 5000 kg, 5 stations, speed 1.00 m/s.
Ceres Panorama is one of the largest buildings in Aarhus, Denmark. With an imposing appearance, Ceres Panorama is a residential building with 130 private properties. Within this work were installed 4 elevators of the type:
Located in the city of Liverpool in the United Kingdom, Royal Liverpool University Hospital is the largest university hospital in the district of Merseyside and Ceshire and has the largest guard room in the UK. Within this major project predominated the installation of elevators with capacities of 2550 kg, speed 1.6m/s, the number of stations being variable, between 8, 11 and 12.
Elegant and spacious, Westgate Shopping Center reinvents Oxford as a final retail and lifestyle destination. The shopping complex has about 800,000 square meters, and has unique restaurants and cafes, a boutique cinema and elegant bars located on the roof of the building. Within this project were installed 24 elevators with a weight between 1000 and 2500 kg, speed 1.0m/s and 1.6m/s.
Liverpool University Hospitals one of the largest medical centers in Merseyside. This work is one of the most important projects carried out in England. Within this work were installed 13 elevators with a weight between 2250kg and 4000 kg.
Founded in Sweden, IKEA is a company that sells home furniture. The company is owned by a Dutch foundation and is run by the Kamprad family. Opened in July 2017, the IKEA complex is located in Sheffield Road, Tinsley and offers a wide range of high quality products, well designed and accessible to all people. IKEA Sheffield was alarge-scale project in which 12 elevators from 1600 to 5000 kg, speed 1.0 m/s were installed, predominating freight elevators.
Located in the heart of Oxford, Primark Westgate Oxford is characterized by style, quality and affordability. The new destination is unique in the variety of styles both for the home and in clothing. The Westgate project included the installation of 4 elevators of 2000 kg, 3 stations and 1.0 m/s.
FC Stadium Expansion was another project in England. It is located in Anfield, Liverpool, being the sixth largest stadium in England. Within this project were installed 6 elevators, 3 of them with VIP cabin, with capacities of 1600 kg, from 2 to 7 stations, speed 1.00 m/s and 2.00 m/s.
Gothia Towers was the most important project in Sweden, being the largest hotel in the Nordic countries. Gothia Towers is part of the Swedish Congress Center. The building includes public halls, accommodation facilities and offices. Within this work were installed 12 elevators, 2 of them panoramic of 1250 kg, with 22 stations, speed, 3.50 m/s.
Located in an opulent area of Dublin, Three Park Place is a modern office building. Three Park Place has set the benchmark in the development of the work environment, in its improvement and in the creation of optimal conditions at work. Within this project were installed 6 elevators of 1275 kg, 10 stations, speed, 2.5 m/s, and some of them presented special options such as: glass cabin walls and KDM 40.
The Dawson Street complex is an office building that reproduces the contemporary style and maximum flexibility in terms of modernizing the employee's life within the company and offering the most favorable conditions at work. Within this project, the elevators with a weight between 1125 and 4000 kg, speed 1.00 m/s and 2.00 m/s were the most. The elevators presented special options such as the 5th slide with rope locking system.
The project called Cruiserath BMS took place in Ireland. Bristol-Myers-Squibb is a pharmaceutical companylocated in Dublin, which aims to increase pharmaceutical production. Within this project were assembled 6 elevators weighing between 2250 kg and 4000 kg.
Located in the heart of Dublin, the Capital Dock project introduces a unique, campus-style work environment. Built in a single phase, the complex improves the work style and professional life through the balance of open spaces and the essential positioning of the complex. This major project is highlighted by the 11 elevators with special options such as KDM 40 and 90, EBD, with capacities between 1275 and 1600 kg, speed 1.60 and 2.50 m/s.
City Quays 2 is a nine-levels office building that offers opportunities and space for employees to work. It has a café and a car park. This project includes 2 elevators weighing between 1600-2000 kg, speed 2.00 m/s, 9 18-door stations with special options such as KDM 40 and 90.
The Maldron Hotel was originally a 206-room building, but in the meantime the complex's architect has applied to increase the number of rooms to 237 without a substantial increase in budget. The contemporary air of the complex is combined with modern finishes resulting in a work of impeccable quality. Within the Maldron project were installed 4 elevators were installed, with weights between 800 and 1000 kg, 13 stations, speed between 1.60 and 2.00 m/s with special options such as KDM 40 Slim.
Allstate is the largest IT company in Northern Ireland, a major hub for innovative software development, covering the entire software design, development, maintenance and support lifecycle. Allstate plays a strategic role in developing, transforming and maintaining the various technology platforms used in this complex to support day-to-day business. Allstate focuses on providing quality customer service and has extensive experience in delivery and IT services. Within this project were installed 3 elevators weighing 1150 kg, speed 1.75 m/s with special options such as KDM 40 SLIM
The College Avenue complex can be considered a small town due to the facilities it offers such as: parking, landscaped courtyards, accommodation and commercial spaces. The College Avenue project includes the installation of 4 elevators with weights of 630 kg, 11-12 stations, speed between 1.00 m/s and 1.60 m/s with special options such as balancing chain.
City Quays 2 is a nine-level office building that offers opportunities and space for employees to work. It has a café and a car park. This project includes 2 elevators weighing between 1600-2000kg, speed 2.00 m/s, 9 18-door stations with special option such as KDM 40 and 90.
Atrium is a complex of 4 buildings located 15 minutes from the center of Paris, which offers 15,000 square meters of office space, arranged on 7 levels, plus ground floor. Within this project were installed 7 elevators with capacities of 800 kg and 7 stations.
Orange Villejuif is the second largest Orange center, with 1,100 employees. The building includes 18,000 sqm of office space, arranged on 7 levels. This project includes the installation of 2 elevators with a capacity of 800 kg, which serves 7 stations.
Sanzillon Clichy is a complex of new buildings, with 7 to 10 floors, offering modern apartments (from 2 to 5rooms). Within this project were installed 3 elevators with capacities between 800 and 1000 kg, with 8 or 10 stations.
Our designs can be adapted to the individual needs of the client. We offer professional support and technical advice as well as full access to information during the planning of your projects.